Field notes

Notes that earn their keep.

Practical guides on Alberta industrial scaffolding for procurement, safety, and site teams. Plain answers on codes, tags, planning and cost, written for the people who buy and run the work.

Safety logbooks and inspection tags on steel deck with fogged industrial scaffold behind. Safety

01 5 min

How to evaluate a scaffolding contractor’s safety program

How to vet a scaffolding contractor's safety program in Alberta: COR, SECOR, ACSA letters, WCB clearance, and owner portals, with a scorecard.

Read note
Stacked galvanized scaffold frames and decks in a foggy industrial laydown yard. Rentals

02 5 min

Scaffold rentals vs full erection service

When to rent scaffold equipment only and when to hire full erection, tagging, and dismantle, with a responsibility matrix and a decision tree.

Read note
Mobile rolling scaffold tower with casters on an industrial floor in soft fog. Access

03 5 min

Rolling scaffold or fixed scaffold? The 3:1 rule and when to move

When a rolling scaffold beats a fixed one: Alberta OHS Code s.334 height-to-base ratios, riding limits, wheel locks, and a buyer acceptance test.

Read note
Modular scaffold tower with internal ladders and full plank decks in fog at an Alberta industrial plant. Access

04 7 min

Scaffold ladders, planks, and platforms in Alberta

Alberta OHS Code ss.327 to 330 in measurements you can check with a tape: ladder cages, plank overhang, platform width, and the gap to the structure.

Read note
RFQ checklist clipboard and hard hat by a window overlooking scaffold in fog. Procurement

05 5 min

RFQ checklist for industrial scaffolding in Alberta

An RFQ checklist for Alberta industrial scaffolding: scope and faces, loads, Part 23 lines, tags, prequal documents, and closeout, ready to edit.

Read note
Green, yellow, and red scaffold inspection tags on steel ledger in fog, industrial plant soft behind. Safety

06 6 min

Scaffold tags in Alberta: green, yellow, red, and the 21-day rule

Alberta scaffold tags under OHS Code s.326: what green, yellow, and red ask of you, how to read a tag, a worked 21-day expiry, and a walkdown audit.

Read note
Scaffold drawings and measuring tape on wet ground with a fogged industrial scaffold behind. Procurement

07 4 min

What drives scaffolding cost on Alberta industrial jobs

What drives the cost of industrial scaffolding in Alberta: duration, geometry, engineering, labour windows, wrap, and logistics, with no fake averages.

Read note
Multi-level industrial scaffold around plant pipe racks in soft fog, no people. Turnarounds

08 6 min

Turnaround scaffold planning before the outage

A pre-outage plan for scaffold access on Alberta shutdowns and turnarounds: what to lock early, hold points, tag boards, and RFQ lines that work.

Read note
Tube-and-clamp fittings beside modular system scaffold nodes in fog, steel detail. Access

09 5 min

Tube-and-clamp vs system scaffolding for industrial work

Tube-and-clamp versus system scaffolding on industrial work: geometry, load, erection speed, inspection focus, and what to write into the RFQ.

Read note
Scaffold tower wrapped in white weather enclosure fabric glowing faintly in fog. Weather wrap

10 5 min

Winter scaffold enclosures: hoarding, heat, and tighter ties

How a winter enclosure changes an Alberta scaffold: tighter hoarded tie spacing under OHS Code s.324, heat and air quality, wind, and bid questions.

Read note

Let’s work together.

Get a quote