Field notes
Notes that earn their keep.
Practical guides on Alberta industrial scaffolding for procurement, safety, and site teams. Plain answers on codes, tags, planning and cost, written for the people who buy and run the work.
Safety How to evaluate a scaffolding contractor’s safety program
How to vet a scaffolding contractor's safety program in Alberta: COR, SECOR, ACSA letters, WCB clearance, and owner portals, with a scorecard.
Read note
Rentals Scaffold rentals vs full erection service
When to rent scaffold equipment only and when to hire full erection, tagging, and dismantle, with a responsibility matrix and a decision tree.
Read note
Access Rolling scaffold or fixed scaffold? The 3:1 rule and when to move
When a rolling scaffold beats a fixed one: Alberta OHS Code s.334 height-to-base ratios, riding limits, wheel locks, and a buyer acceptance test.
Read note
Access Scaffold ladders, planks, and platforms in Alberta
Alberta OHS Code ss.327 to 330 in measurements you can check with a tape: ladder cages, plank overhang, platform width, and the gap to the structure.
Read note
Procurement RFQ checklist for industrial scaffolding in Alberta
An RFQ checklist for Alberta industrial scaffolding: scope and faces, loads, Part 23 lines, tags, prequal documents, and closeout, ready to edit.
Read note
Safety Scaffold tags in Alberta: green, yellow, red, and the 21-day rule
Alberta scaffold tags under OHS Code s.326: what green, yellow, and red ask of you, how to read a tag, a worked 21-day expiry, and a walkdown audit.
Read note
Procurement What drives scaffolding cost on Alberta industrial jobs
What drives the cost of industrial scaffolding in Alberta: duration, geometry, engineering, labour windows, wrap, and logistics, with no fake averages.
Read note
Turnarounds Turnaround scaffold planning before the outage
A pre-outage plan for scaffold access on Alberta shutdowns and turnarounds: what to lock early, hold points, tag boards, and RFQ lines that work.
Read note
Access Tube-and-clamp vs system scaffolding for industrial work
Tube-and-clamp versus system scaffolding on industrial work: geometry, load, erection speed, inspection focus, and what to write into the RFQ.
Read note
Weather wrap Winter scaffold enclosures: hoarding, heat, and tighter ties
How a winter enclosure changes an Alberta scaffold: tighter hoarded tie spacing under OHS Code s.324, heat and air quality, wind, and bid questions.
Read note