Field notes Access

Scaffold ladders, planks, and platforms in Alberta

Four sections of the Alberta Occupational Health and Safety Code decide most of what a person feels underfoot on a scaffold: s.327 (vertical ladders), s.328 (working from a ladder), s.329 (planks), and s.330 (the platform). Unlike load design or engineering, every one of them can be checked on a walkdown with a tape measure and a flashlight. This note turns those sections into measurements a buyer, supervisor, or safety lead can verify before a face is released.

It is a reading of the public King’s Printer text of Part 23, not legal advice. For the load rules, tie spacing, and rolling scaffold ratios, see the short Alberta scaffold rules guide. For tags and the 21-day clock, see Scaffold tags in Alberta.

Answer first

Item Alberta number Section
Ladder extends above top working level at least 1 m s.327(3)(c)
Ladder rung spacing (centre to centre) 250 mm to 305 mm s.327(3)(d)
Longest unbroken ladder run 9.1 m, from ground or between working levels s.327(3)(e)
Cage required ladder over 6.1 m; cage starts within 2.4 m s.327(3)(f)
Cage inside size 760 mm maximum, round or square s.327(4)
Sawn lumber plank size 51 mm × 254 mm s.329(2)–(3)
Plank overhang past a ledger 150 mm to 300 mm s.329(4)(c)
Overlapping plank past a ledger at least 300 mm s.329(5)
Platform width at least 500 mm (nominal 300 mm with ladderjacks or pump jacks) s.330(1)(a)
Gap between platform and structure no more than 250 mm s.330(1)(b)

If a released face misses one of these, it is a finding against a numbered section, not a matter of taste.

Vertical ladders on the scaffold (s.327)

A ladder fixed to a scaffold is a way between levels, nothing more. Section 327(1) limits its use to moving up or down between scaffold levels. While climbing, a worker keeps a 3-point stance and keeps every part of the body except an arm inside the side rails (s.327(2)).

The employer’s duties under s.327(3) are physical and easy to verify:

  • Fastened and plumb. The ladder is secured to the scaffold and does not lean away from it.
  • Long enough at the top. It runs at least 1 m past the uppermost working level, so a climber has something to hold while stepping off.
  • Even rungs. Spacing sits between 250 mm and 305 mm, centre to centre. Mixed components from different suppliers are where this drifts.
  • Broken into runs. No single unbroken length beyond 9.1 m, measured from the ground or between working levels.
  • Caged when tall. Over 6.1 m, a cage starts within 2.4 m of the ground or working level. The cage is no wider than 760 mm inside, round or square (s.327(4)).

Section 327(5) gives one alternative: a longer run with no cage is allowed when a fall protection system that complies with Part 9 is in use. If a design relies on that option, the RFQ or method statement should say which system, so the walkdown has something to compare against.

No work from the access ladder (s.328)

Section 328 puts the same rule on both sides: the employer must ensure no one works from a ladder that gives access to the scaffold’s working levels, and the worker must not do it. If a task can only be reached from the access ladder, the scaffold is missing a platform. Ask for a lift added to the design rather than accepting “just a quick reach.”

Planks (s.329)

Section 329 separates two kinds of plank:

  • Commercially manufactured planks (steel, aluminium, or engineered wood decks) are used, stored, inspected, and maintained to the manufacturer’s specifications (s.329(1)). The buyer’s check is simple: the manufacturer’s data should be available for the plank on site.
  • Solid sawn lumber planks are graded scaffold grade or better and sized 51 mm by 254 mm (s.329(2)). Where no manufacturer specifications exist, s.329(3) calls for at least number one grade lumber of that size, wane limited to 20 percent of the wide face, and warp limited so the surface stays flat.

Every plank, whatever the material, then follows s.329(4):

  1. A competent worker inspects it visually before it goes into the scaffold.
  2. If that inspection shows damage that could affect strength or function, it passes a load test before installation.
  3. It extends at least 150 mm and no more than 300 mm past a ledger.
  4. It is secured against movement in any direction that could endanger a worker.

Overlapped planks are the exception to the 300 mm cap: each overlapping plank extends at least 300 mm beyond the ledger (s.329(5)). Too little overhang lets a plank slip off; too much creates a tipping trap at the end of the span. Both show up quickly when you look along a deck from the end.

The platform itself (s.330)

Section 330(1) sets four conditions for the working platform:

  • Width. At least 500 mm. A nominal 300 mm platform is allowed only with ladderjacks, pump jacks, or similar systems.
  • Gap to the structure. No open space wider than 250 mm between the platform and the structure being worked on. On curved vessels and around nozzles, this is the measurement that most often needs a closer look.
  • Footing on slopes. A platform that is not level is designed so workers still have adequate footing.
  • Continuity. The deck continues around obstructions so there is no opening a worker could step into or fall through.

Two base and traffic rules worth adding to the walkdown

Section 324(5) asks for reasonable measures to protect scaffolding from contact by powered mobile equipment or vehicles. On plant roads, laydown yards, and shop floors, that usually means barriers or a defined exclusion zone in the traffic plan. For single-pole and double-pole scaffolds, s.324(1)(d) also requires the scaffold to be set plumb on a base plate, jackscrew, or other load-dispersing device on a stable surface.

Walkdown checklist

Take a tape, a flashlight, and the released drawing.

  • Access ladder fastened, plumb, and at least 1 m above the top working level
  • Rung spacing 250 mm to 305 mm on every section
  • No unbroken ladder run over 9.1 m without the Part 9 option documented
  • Cage on ladders over 6.1 m, starting within 2.4 m, 760 mm inside or less
  • No task planned from the access ladder
  • Manufacturer data available for manufactured planks
  • Lumber planks 51 × 254 mm, scaffold grade or better, no visible damage
  • Plank overhang 150 mm to 300 mm; overlaps at least 300 mm
  • Planks secured against uplift and sliding
  • Platform at least 500 mm wide
  • Gap to the structure 250 mm or less
  • Deck continuous around obstructions
  • Vehicle protection where traffic passes
  • Tag present and current at each entry (see scaffold tags)

Lines to put in a scaffold RFQ

Edit these to fit your package:

  • “Access ladders, planks, and platforms comply with Alberta OHS Code ss.327 to 330. Where s.327(5) is used in place of ladder cages, the method statement names the Part 9 fall protection system.”
  • “Manufacturer specifications for manufactured planks are available on site for the owner’s review.”
  • “Platform-to-structure gaps over 250 mm are closed before the face is tagged for use.”
  • “Vehicle and mobile equipment protection is shown on the scaffold layout where s.324(5) applies.”

The full procurement list is in the RFQ checklist for industrial scaffolding.

Where this fits on PrimeTime work

These are the details a crew builds into access scaffolding on columns, pipe racks, and vessels, and the steel planks listed under equipment rentals. If you are planning a job in Edmonton or elsewhere in Alberta, ask for a quote and include the faces, heights, and any obstructions the platform has to wrap around.

FAQ

How far must a scaffold plank extend past the ledger in Alberta?

Between 150 mm and 300 mm under s.329(4)(c). An overlapping plank extends at least 300 mm beyond the ledger under s.329(5).

What is the minimum scaffold platform width in Alberta?

500 mm under s.330(1)(a). A nominal 300 mm platform is allowed only with ladderjacks, pump jacks, or similar systems.

When does a scaffold ladder need a cage in Alberta?

When the ladder is more than 6.1 m high, the cage starts within 2.4 m of the ground or working level (s.327(3)(f)). A Part 9 fall protection system can replace the cage (s.327(5)).

Can a worker work from the ladder that gives access to the scaffold?

No. Section 328 says no work is done from a ladder used to reach the working levels of a scaffold.