Our standard procedure.
PrimeTime Contractors raises industrial and commercial scaffold to one standard on every job. The five commitments on this page are what the client gets. They apply on every site, from the first walk to the last plank. Scaffold inspection in Alberta, scaffold tagging, scaffold safety standards, and an engineered scaffold plan sit inside those commitments. The standards named here are public.
Get a quote
01
Site walk and assessment
Before a price and before a plan, the site is walked. The walk looks at what has to be reached, how materials will arrive, what the structure can carry, and what is already in the way. The client gets that picture in plain words. A photograph is not a substitute for the walk.
02
A scaffold plan, engineered where the Code requires it
The job gets a scaffold plan before anything is raised. The plan says what is being built, how it is tied in, and what load it is for.
Section 325(3) of the Alberta Occupational Health and Safety Code applies when the load is above 367 kg/m². Section 325(4) applies when the scaffold is a type the Code does not cover. Those are the Alberta triggers for an engineered scaffold plan.
Section 331 requires metal scaffold to follow the manufacturer specifications or specifications certified by a professional engineer.
A short tower and a hung scaffold are not the same problem, so the plan follows the work.
CSA Z797:23 is the national code of practice for access scaffold. It is named here as context for how a scaffold is planned and erected. It is not a company credential.
When the Code requires an engineer: when a scaffold needs an engineer.
03
Competent, ticketed crews
The crew that raises the scaffold is competent for that work. In Alberta occupational health and safety law, a competent worker is a person who is adequately qualified, suitably trained, and sufficiently experienced to do the work safely.
The tickets a PrimeTime crew holds are not named on this site. No ticket, no count, and no training body is listed as a company credential.
Crew policy
Every worker's scaffolding ticket is checked before they are sent.
No untrained worker is ever sent.
04
Inspection and tagging
Scaffold inspection in Alberta is a public rule, not a company badge. Part 23 of the Alberta Occupational Health and Safety Code covers scaffolds and temporary work platforms. Section 326 is the part that deals with scaffold tagging and how often named scaffold types are inspected. The steps below are that public rule, in plain words. Scaffold safety standards from CSA Z797:23 sit beside it as a code of practice, not as a PrimeTime certification. A company interval shorter than the public maximum is not published until it is confirmed.
- 01
Inspect before first use
A competent worker inspects the scaffold before it is used for the first time.
- 02
Tag each point of entry
A colour coded tag is placed at each point of entry. Green means safe for use. Yellow means a potential or unusual hazard. Red means unsafe for use.
- 03
Inspect again on the public clock
Bracket, double-pole, needle-beam, outrigger, single-pole, suspended and swingstage scaffolds are inspected again at intervals of not more than 21 calendar days while workers work from the scaffold or materials are stored on it.
- 04
Keep workers off a bad tag
A worker does not use a scaffold with a red tag, with a green or yellow tag that has expired, or with no tag at all, except a competent worker who is erecting, inspecting, or dismantling it.
Scaffold tags in Alberta, the full guide. The colours and the 21-day clock are the public rule.
Public source
The same Part 23 rules, written as guides. Each note quotes a section from the public Code text.
05
A clean teardown
When the work is finished, the scaffold comes down. Materials leave the site. The ground is left as it was found, aside from the work the client asked for. Nothing stays up because it was easier to leave it standing. The teardown is part of the job.