When a scaffold needs an engineer.
When does a scaffold need an engineer in Alberta?
Alberta has no 10 m rule that sends a scaffold to a professional engineer.
Section 325(3) applies above 367 kg/m².
Section 325(4) applies when the type is one the Code does not list.
Metal scaffold follows section 331.
These notes quote the Code.
Checked on 2026-11-04
No height rule
Height, by itself, does not send an Alberta scaffold to a professional engineer.
Alberta
Alberta has no 10 m professional engineer rule.
| Province | Height rule |
|---|---|
| Alberta | No height trigger. Load and type decide. |
| Manitoba | Open access over 10 m. Enclosed or hoarded over 7.5 m. |
| Ontario | Over 15 m. Tube and clamp, over 10 m. |
Not Alberta law Ontario measures that height above the base. Manitoba measures the scaffold height. Neither figure is an Alberta rule.
s.325(3)
The load, and the type
Section 325 names two cases that need a professional engineer.
s.325(3)
The load is above 367 kg/m².
s.325(4)
The scaffold is a type the Code does not list.
Metal scaffold
Section 331 covers a metal scaffold.
s.331
Manufacturer specifications, or specifications a professional engineer certifies.
Hung, and not from a catalogue
Sections 341 and 342 cover suspended scaffolds and swingstages that are not manufactured.
s.341(2)(b)
A non-manufactured suspended scaffold needs a professional engineer.
s.342
A non-manufactured swingstage needs a professional engineer.
Shoring over 3.7 m
Section 352(3) is the shoring trigger.
s.352(3)
Shoring over 3.7 m needs a professional engineer.
Not because it moves
A platform does not need an engineer only because it can move.
- 01 Rolling scaffolds follow section 334, a multiple of the base.
- 02 Elevating platforms follow the CSA or ANSI standard in section 347.
Questions.
Is 10 m an Alberta rule for a professional engineer?
No. Alberta has no 10 m professional engineer rule. Manitoba uses 10 m for open access and 7.5 m when the scaffold is enclosed or hoarded. Ontario uses 15 m, or 10 m for tube and clamp.
When does section 325 call for an engineer?
When the load is above 367 kg/m², under section 325(3). Or when the scaffold is a type the Code does not list, under section 325(4).
Who sets the specifications for metal scaffold?
Section 331 names the manufacturer, or a professional engineer who certifies the specifications.
Do suspended scaffolds and swingstages need an engineer?
When they are not manufactured. Section 341(2)(b) covers the suspended scaffold. Section 342 covers the swingstage.
When does shoring need an engineer?
Section 352(3) applies when the shoring is over 3.7 m.
Does a rolling scaffold need an engineer because it rolls?
No. Section 334 sets the height at three times the base, and a ride at twice the base. Section 347 points an elevating platform to a CSA or ANSI standard.